What Is Booster Compression?
Booster compression increases the pressure of gas at the wellhead or within the production system to overcome backpressure, improve flow rate, and allow the reservoir to produce at its full potential. When wellhead pressure exceeds the pressure differential the reservoir can overcome on its own, the well underproduces — or doesn’t produce at all. A booster compressor closes that gap.
It’s most commonly used on new well completions that need an initial pressure boost to establish flow, on existing wells where declining reservoir pressure has reduced production below economic thresholds, and on wells where surface equipment or pipeline backpressure is restricting what the reservoir can deliver.
Eco-Lift’s mobile booster compression service brings that capability directly to your well site — no permanent installation, no long-term contract, and no waiting for equipment that’s two counties away.
When You Need
Booster Compression
New Well Completions
A newly completed well often needs an initial pressure boost to establish flow through the production system and get gas moving to the separator and sales line. Mobile booster compression gets new wells into production faster — reducing the time between spud and first sales and improving the economics of every new drill in your program.
Declining Reservoir Pressure
As a well ages, reservoir pressure naturally declines. When wellhead pressure drops below the pressure required to move gas through the production system and into the pipeline, production dies back. A booster compressor reduces the backpressure on the wellbore, allowing the reservoir to continue producing at a rate that justifies keeping the well online.
Pipeline or Facility Backpressure
Sometimes the restriction isn't in the reservoir — it's in the surface equipment. High pipeline pressure, undersized separators, or long flowline runs can create backpressure that limits what the well can deliver. A booster compressor installed between the wellhead and the restriction allows the well to produce against lower backpressure and flow at its actual capacity.
Marginal and Stripper Wells
Oklahoma has thousands of stripper wells producing at low rates on thin margins. For these wells, even a modest increase in flow rate can mean the difference between a well that pays and one that gets shut in. Mobile booster compression on a day-rate basis allows operators to test whether compression will improve production before committing to a permanent installation.
Equipment & Capabilities
Our trailer-mounted booster compression units are self-contained, natural gas powered, and built to connect to your existing production equipment on arrival.
Maximum Pressure
5,100 PSIG
Maximum Flow Rate
2 MMSCFD
Mounting
Trailer-mounted, self-contained
Power Source
Natural gas powered
Fleet
Multiple units at varying PSI ratings — matched to your wellhead pressure and flow requirements
Certifications
We carry multiple units across a range of pressure ratings so we can match equipment to your specific wellhead pressure, flow rate, and compression ratio requirements. Call us with your well data and we’ll tell you which unit fits the application.
How It Works
Step 1Call Us With Your Well Data
Tell us your wellhead pressure, your target flow rate, and what you're trying to accomplish — whether that's getting a new completion flowing, recovering production on a declining well, or testing whether compression will improve a marginal well's output. We'll confirm the right unit for the job and how fast we can mobilize.
Step 2We Dispatch to Your Location
Our trailer-mounted unit mobilizes to your well site anywhere in Oklahoma or Texas. We run 24 hours a day so we can dispatch on your schedule, not ours.
Step 3We Connect and Establish Flow
On arrival we connect the booster unit to your production equipment, set suction and discharge pressures to the required parameters, and bring the compression online. We monitor the unit during startup to confirm the well is responding as expected.
Step 4Production at Its Potential
With backpressure reduced and compression maintaining the required differential, the well produces at the rate the reservoir can deliver. When the job scope is complete — whether that's a single day or an extended production support period — we release the equipment and invoice for the time on location.
Who We Serve
Drilling and
completions teams
who need booster compression support to get new wells into production quickly after completing and perforating.
Production
engineers
evaluating whether compression will improve flow rates on declining or underperforming wells before committing to a permanent compression installation.
Lease
operators
managing stripper wells in the Anadarko Basin and surrounding Oklahoma plays who need a cost-effective way to keep marginal wells producing.
E&P operations
managers
running workover and recompletion programs where temporary booster compression is needed as part of the production restoration scope.
Well service
companies
who need a compression subcontractor for jobs that require wellhead pressure management as part of a broader intervention program.
Frequently Asked Questions
What is the difference between booster compression and well stimulation?
Well stimulation uses compression to lift accumulated fluid out of a loaded wellbore and restore a well that has died back due to liquid loading. Booster compression reduces backpressure on the wellhead to allow a well to flow at a higher rate — it’s about optimizing flow on a well that is already producing, or establishing flow on a new completion. Both use mobile compression equipment, but they solve different production problems.
How do I know if my well needs booster compression?
Common signs include a new completion that is flowing below expectations, an existing well whose production has declined steadily as reservoir pressure has dropped, or a well where surface equipment or pipeline backpressure appears to be restricting flow. If your well test data shows the reservoir has deliverability your surface production rates don’t reflect, backpressure is likely the issue. Call us and walk us through the well data — we’ll give you a straight assessment.
Can booster compression be used as a trial before committing to a permanent compressor installation?
Yes — this is one of the most common reasons operators call us. A day-rate mobile unit lets you confirm whether compression will improve production on a specific well before you justify the capital cost of a permanent installation. If the test confirms compression works, you have the data to support a permanent unit. If it doesn’t, you’ve spent a day rate instead of a capital budget.
Does Eco-Lift require a contract for booster compression services?
No contract required. We operate on a 24-hour day rate with no minimum commitment. Use us for a single-day production test or an extended compression period — the terms are the same either way.
What wellhead pressure and flow rate can your equipment handle?
Our compression equipment operates up to 5,100 PSIG with flow rates up to 2 MMSCFD. We carry multiple units at varying pressure ratings to match the right equipment to your well’s suction pressure, discharge pressure, and flow requirements.
Are you approved to work on major E&P operator locations?
Yes. Eco-Lift holds active credentials with ISN, PEC Premier, SafeLandUSA, the National Safety Council, the Energy Training Council, and the Oklahoma Safety Council, and is HAZMAT certified. These cover the pre-qualification requirements for most major and mid-major E&P operators in Oklahoma and Texas.
Do you provide booster compression in Texas?
Yes. We serve all of Texas including the Permian Basin, Midland Basin, Delaware Basin, and Eagle Ford. Call 580-772-5158 to discuss your location and we’ll confirm equipment availability and mobilization time.