About the STACK Play
STACK stands for Sooner Trend Anadarko Basin Canadian and Kingfisher counties — one of Oklahoma’s most significant unconventional oil and gas plays, sitting within the broader Anadarko Basin. The STACK targets stacked pay horizontal completions in the Meramec, Osage, and Woodford formations, with operators drilling multiple producing zones from common surface locations across Canadian, Kingfisher, Blaine, Garfield, and Major counties.
The play has seen significant horizontal drilling activity, with operators continuing to develop both core and extension acreage. That level of activity creates consistent demand for compression services — new wells need energization to establish flow, maturing horizontals need production optimization as reservoir pressure declines, and the surface infrastructure supporting all of it needs ongoing pressure management and maintenance support.
Eco-Lift dispatches from Weatherford, Oklahoma, putting the STACK play’s core counties well within fast mobilization range.
STACK Play Production Challenges We Solve
New Completion Energization
STACK horizontal completions targeting the Meramec, Osage, and Woodford often need an initial pressure boost to establish flow through the production system after completion and flowback.
Eco-Lift’s booster compression service gets new STACK wells into production faster, reducing the gap between completion and first sales and improving the economics of every new drill.
Production Optimization on Maturing Horizontals
As STACK wells move past their initial flush production period, declining reservoir pressure can begin to restrict flow against existing surface backpressure. Booster compression reduces that backpressure and allows maturing horizontals to continue producing closer to their reservoir potential rather than dying back prematurely.
Liquid Loading in Horizontal Laterals
Horizontal wellbores accumulate liquid differently than vertical wells — fluid can collect in low spots along the lateral, creating loading patterns that are harder to predict and address than in a straight vertical bore. Eco-Lift’s mobile well stimulation connects through existing production equipment and provides the lift energy needed to clear accumulated fluid from horizontal completions without an expensive intervention.
High-Pressure Equipment Requirements
STACK completions targeting the Meramec and Osage at depth often produce at higher initial pressures than conventional Anadarko Basin wells. Our equipment operating up to 5,100 PSIG is matched to the pressure ranges common in STACK play horizontal completions — we’re not bringing low-pressure equipment to a high-pressure well.
Pipeline and Gathering System Support
The pace of STACK play development has put pressure on gathering and midstream infrastructure across Canadian and Kingfisher counties. Eco-Lift’s pipeline maintenance service provides compression support for pigging, pressure testing, and tie-in operations as gathering systems are built out and maintained to keep pace with production.
STACK Play Counties We Serve
- Canadian County — Core STACK acreage. El Reno and Yukon area operations.
- Kingfisher County — Core STACK acreage. Kingfisher and Hennessey area wells, among the most actively drilled counties in the play.
- Blaine County — STACK extension acreage. Watonga and Geary area operations.
- Garfield County — Northern STACK extension. Enid area wells.
- Major County — Northwestern STACK extension. Fairview area operations.
Don’t see your county listed? Call us. If you’re producing in or around the STACK play, we can get to you.
Services Available Across the STACK Play
- Booster Compression — New completion energization and production optimization for maturing horizontals
- Well Stimulation — Clearing liquid loading from horizontal laterals up to 4x faster than swabbing
- Mobile Gas Compression — Trailer-mounted compression up to 5,100 PSIG matched to STACK pressure ranges
- Pressure Reduction & Control — Regulated gas delivery for production equipment and gathering systems
- Pipeline Maintenance — Compression support for gathering system pigging, testing, and tie-ins
- Cold Weather Production Support — 24/7 winter response for STACK play wells and surface equipment
- 24/7 Emergency Service — Emergency dispatch anywhere in the STACK play any time of day or night
Why STACK Play Operators Choose Eco-Lift
We’re close. Weatherford sits within fast dispatch range of the STACK play’s core counties. We’re not mobilizing from out of state or from the other side of Oklahoma.
We understand horizontal completions. Liquid loading and pressure behavior in a horizontal lateral isn’t the same as a conventional vertical well. We bring the right equipment and the right approach to STACK completions specifically.
We’re built for high-pressure work. Equipment operating up to 5,100 PSIG matches the pressure ranges common in Meramec and Osage completions across the play.
We don’t require a contract. Whether you need one-time energization on a new completion or ongoing production optimization support, our day-rate model fits the job without locking you into a long-term agreement.
We’re credentialed for major operator locations. ISN, PEC Premier, SafeLandUSA, HAZMAT certified — the pre-qualification requirements for the operators actively developing the STACK play.
Get Compression on Location Anywhere in the STACK Play
Call us with your county, your well type, and what you’re dealing with. We’ll tell you straight what we can do and how fast we can be there.
Frequently Asked Questions
What formations does the STACK play target?
The STACK play targets stacked pay horizontal completions primarily in the Meramec, Osage, and Woodford formations, with operators often drilling multiple producing zones from common surface locations across Canadian, Kingfisher, Blaine, Garfield, and Major counties.
How is compression different for STACK horizontal wells compared to conventional vertical wells?
Horizontal laterals accumulate liquid differently than vertical wellbores — fluid can collect at low points along the lateral rather than settling uniformly, which changes how loading develops and how it needs to be addressed. STACK completions also frequently produce at higher initial pressures than older conventional Anadarko Basin wells, requiring equipment matched to that pressure range. Eco-Lift’s fleet includes units rated up to 5,100 PSIG specifically to handle these higher-pressure horizontal applications.
How quickly can you respond to a call in the STACK play?
Canadian and Kingfisher counties are within fast mobilization range of our Weatherford base. Call 580-819-1073 directly and we’ll give you a realistic response time based on your specific location and current equipment positioning.
Do you provide booster compression for new STACK completions?
Yes. New completion energization is one of our most common STACK play service calls. We connect to the production system after completion and flowback and provide the initial pressure boost needed to establish flow and get the well into production.
What pressure range can your equipment handle for STACK wells?
Our compression equipment operates up to 5,100 PSIG with flow rates up to 2 MMSCFD. We carry multiple units at varying pressure ratings to match STACK play horizontal completions, which often produce at higher initial pressures than conventional basin wells.
Are you credentialed to work on major operator locations in the STACK play?
Yes. Eco-Lift holds active credentials with ISN, PEC Premier, SafeLandUSA, the National Safety Council, the Energy Training Council, and the Oklahoma Safety Council, and is HAZMAT certified. These cover the pre-qualification requirements for the major and mid-major operators actively developing the STACK play.
Do you require a contract for STACK play compression work?
No contract required. We operate on a 24-hour day rate with no minimum commitment, whether the job is a single-day energization or an extended production optimization period.